Worldwide in Operation

For oil, gas and geothermal drillings >>

Presentation of mobile geothermal workover rig GWR 100

About 100 visitors accepted the invitation of MAX STREICHER GmbH & Co. KG aA/Division Drilling Technology and attended the presentation of a new mobile workover rig for deep geothermal energy on 19th of July 2018.

Visitors of STREICHER - Drilling Technology presentation

Visitors of STREICHER - Drilling Technology presentation

Together with the "Stadtwerke München", STREICHER developed a rig that enables an efficient and safe installation and removal of heavily used feed pumps in deep geothermal energy. Assembled on a specially designed semitrailer the workover rig provides the greatest possible mobility combined with low space requirement. Development and construction of the mobile rig were funded by the Federal Ministry of Economics and Energy.

Within an extensive presentation and live demonstrations the international audience had the chance to find out about technical characteristics of the STREICHER GWR 100. The event was complemented by a tour through the production halls at the company site Deggenau and several speeches. Finally all participants enjoyed a real Bavarian evening.